A meeting cabin in its own right, drawn from the ECOlink range and made to bolt to and stack on other ECOlink units, so an entire project compound goes together as one connected block. It will sit alongside ECOlink offices, canteens, canteen/kitchens and drying rooms in whatever combination the compound needs, and the flat-sided exterior is a deliberate choice for compounds that front a public road.
Dimensions
- External: 9.76 × 3 × 2.7 m (32 ft 0 in × 9 ft 10 in × 8 ft 10 in)
- Internal: 9.51 × 2.75 × 2.3 m (31 ft 2 in × 9 ft 0 in × 7 ft 7 in)
- Door opening: 0.8 m wide × 1.99 m high (2 ft 7 in × 6 ft 6 in)
- Windows: 4, uPVC double glazed · floor: 18 mm particle board
What comes as standard
- Links side by side and stacks with other ECOlink units
- Works with ECOlink offices, canteens, canteen/kitchens and drying rooms
- Flat-sided exterior, so the finish suits a public-facing compound
- Lighting run on PIR sensors
- Timed heating; air source heating and cooling can be added as an option
- 4 × uPVC double glazed windows
- 18 mm particle board floor
Why a separate meeting room pays for itself
On any project of size the site office fills up, and then every progress meeting, induction, subcontractor briefing and client visit is held in the middle of everyone trying to get on with the job. Give that traffic a cabin of its own and the working office carries on working. At 9.51 m internal there is room for a full boardroom table and a presentation wall without the room being crossed by people fetching drawings.
The finish matters where the public can see it
A flat-sided cabin presents considerably better than a corrugated one, which is why these get specified on housing schemes, city-centre developments and infrastructure work with a public interface. It is the same argument as hoarding graphics: the compound is the most visible thing about the project for its whole duration, and a meeting cabin is where clients and planners are taken.
Delivery, siting and cover
Delivery is free across the UK, including Northern Ireland, the Isle of Man, Jersey and Guernsey, and the price shown is the total payable — no VAT is added at checkout. Because this unit is normally bought to be linked or stacked with others, the siting question is about the block rather than the cabin: level, load-bearing ground across the full intended footprint, and a crane and foundation check for any stacked arrangement, which we will confirm when we quote. HIAB or crane offload is agreed in writing before delivery. If you are ordering more than one ECOlink unit, tell us the intended configuration at quote stage — link direction and stack height change the foundation and the lift plan. Cover is 12 months against structural defects and water ingress; separately, you have 14 days to change your mind under the Consumer Contracts Regulations 2013 and 30 days to reject faulty goods under the Consumer Rights Act 2015.
Related units
Bolted to a 32ft ECOlink drying room cabin it becomes a combined welfare and management block; add a 32ft x 10ft jackleg plastisol office cabin where day-to-day desk space is wanted too. Similar cabins appear across the portable cabin range, and container conversions doing much the same job sit in the specialised container range. Tell us the stacking or linking arrangement you have in mind when you request a quote, and we will confirm what the crane and the foundations have to do.
Reviews
There are no reviews yet.